Between January and mid February 2018 the North Coast of Dominican Republic received 26 consecutive days of rain. While the winter months can bring more moisture and rain to the island, this particular year was much stronger than what is typical. As a result of this weather condition we have pushed back our infrastructure construction schedule to wait for a dryer period of time. Our critical efforts to start the infrastructure roads, power, water and sewer elements are extremely challenging at our project site with earth that is soaked with moisture. Major excavation and earth moving will be all the more challenging in wet conditions. We will keep you all posted over the next few weeks.